[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"law-eurlex-reg_2014_1301-de":3},{"abbreviation":4,"title":5,"source_type":6,"total":7,"offset":8,"entries":9},"reg_2014_1301","über die technische Spezifikation für die Interoperabilität des Teilsystems „Energie“ des Eisenbahnsystems in der Europäischen Union","eurlex",159,0,[10,15,18,21,24,27,30,33,36,39,42,45,48,51,55,59,63,67,71,75,79,83,87,91,95,99,103,106,109,112,115,118,121,124,127,130,133,136,139,142,145,148,151,154,157,160,163,166,169,172,175,178,181,184,187,190,193,196,199,202,205,208,211,214,217,220,223,226,229,232,235,238,241,244,247,250,253,256,259,262,265,268,271,274,277,280,283,286,289,292,295,298,301,304,307,310,313,316,319,322,325,328,331,334,337,340,343,346,349,352,355,358,361,364,367,370,373,375,377,379,381,383,385,387,389,391,393,395,397,399,401,403,406,409,412,415,418,421,424,427,430,433,436,439,442,445,448,451,454,457,460,463,466,469,472,475,478,482,486],{"norm_key":11,"title":12,"chapter":13,"slug":14},"ErwGr. 1",null,"Erwägungsgründe","erwgr-1",{"norm_key":16,"title":12,"chapter":13,"slug":17},"ErwGr. 2","erwgr-2",{"norm_key":19,"title":12,"chapter":13,"slug":20},"ErwGr. 3","erwgr-3",{"norm_key":22,"title":12,"chapter":13,"slug":23},"ErwGr. 4","erwgr-4",{"norm_key":25,"title":12,"chapter":13,"slug":26},"ErwGr. 5","erwgr-5",{"norm_key":28,"title":12,"chapter":13,"slug":29},"ErwGr. 6","erwgr-6",{"norm_key":31,"title":12,"chapter":13,"slug":32},"ErwGr. 7","erwgr-7",{"norm_key":34,"title":12,"chapter":13,"slug":35},"ErwGr. 8","erwgr-8",{"norm_key":37,"title":12,"chapter":13,"slug":38},"ErwGr. 9","erwgr-9",{"norm_key":40,"title":12,"chapter":13,"slug":41},"ErwGr. 10","erwgr-10",{"norm_key":43,"title":12,"chapter":13,"slug":44},"ErwGr. 11","erwgr-11",{"norm_key":46,"title":12,"chapter":13,"slug":47},"ErwGr. 12","erwgr-12",{"norm_key":49,"title":12,"chapter":13,"slug":50},"ErwGr. 13","erwgr-13",{"norm_key":52,"title":53,"chapter":12,"slug":54},"Art. 1","Gegenstand","art-1",{"norm_key":56,"title":57,"chapter":12,"slug":58},"Art. 2","Anwendungsbereich","art-2",{"norm_key":60,"title":61,"chapter":12,"slug":62},"Art. 3","Offene Punkte","art-3",{"norm_key":64,"title":65,"chapter":12,"slug":66},"Art. 4","Sonderfälle","art-4",{"norm_key":68,"title":69,"chapter":12,"slug":70},"Art. 5","Unterrichtung über bilaterale Vereinbarungen","art-5",{"norm_key":72,"title":73,"chapter":12,"slug":74},"Art. 6","Projekte in einem fortgeschrittenen Entwicklungsstadium","art-6",{"norm_key":76,"title":77,"chapter":12,"slug":78},"Art. 7","EG-Prüfbescheinigung","art-7",{"norm_key":80,"title":81,"chapter":12,"slug":82},"Art. 8","Konformitätsbewertung","art-8",{"norm_key":84,"title":85,"chapter":12,"slug":86},"Art. 9","Umsetzung","art-9",{"norm_key":88,"title":89,"chapter":12,"slug":90},"Art. 10","Innovative Lösungen","art-10",{"norm_key":92,"title":93,"chapter":12,"slug":94},"Art. 11","Aufhebung","art-11",{"norm_key":96,"title":97,"chapter":12,"slug":98},"Art. 12","Inkrafttreten","art-12",{"norm_key":100,"title":101,"chapter":102,"slug":12},"Anhang.1","INHALTSVERZEICHNIS","Anhänge",{"norm_key":104,"title":105,"chapter":102,"slug":12},"Anhang.2","1.1. Technischer Anwendungsbereich",{"norm_key":107,"title":108,"chapter":102,"slug":12},"Anhang.3","1.2. Geografischer Anwendungsbereich",{"norm_key":110,"title":111,"chapter":102,"slug":12},"Anhang.4","1.3. Inhalt dieser TSI",{"norm_key":113,"title":114,"chapter":102,"slug":12},"Anhang.5","2.1. Begriffsbestimmungen",{"norm_key":116,"title":117,"chapter":102,"slug":12},"Anhang.6","2.1.1. Stromversorgung",{"norm_key":119,"title":120,"chapter":102,"slug":12},"Anhang.7","2.1.2. Geometrie der Oberleitung und Stromabnahmequalität",{"norm_key":122,"title":123,"chapter":102,"slug":12},"Anhang.8","2.2.1. Einleitung",{"norm_key":125,"title":126,"chapter":102,"slug":12},"Anhang.9","2.2.2. Schnittstellen zwischen dieser TSI und der TSI „Sicherheit in Eisenbahntunneln“",{"norm_key":128,"title":129,"chapter":102,"slug":12},"Anhang.10","3. GRUNDLEGENDE ANFORDERUNGEN",{"norm_key":131,"title":132,"chapter":102,"slug":12},"Anhang.11","4.1. Einleitung",{"norm_key":134,"title":135,"chapter":102,"slug":12},"Anhang.12","4.2.1. Allgemeine Bestimmungen",{"norm_key":137,"title":138,"chapter":102,"slug":12},"Anhang.13","4.2.2. Eckwerte des Teilsystems „Energie“",{"norm_key":140,"title":141,"chapter":102,"slug":12},"Anhang.14","4.2.3. Spannung und Frequenz",{"norm_key":143,"title":144,"chapter":102,"slug":12},"Anhang.15","4.2.4. Leistungsparameter des Energieversorgungssystems",{"norm_key":146,"title":147,"chapter":102,"slug":12},"Anhang.16","4.2.4.1. Höchster zulässiger Zugstrom",{"norm_key":149,"title":150,"chapter":102,"slug":12},"Anhang.17","4.2.4.2. Mittlere nutzbare Spannung",{"norm_key":152,"title":153,"chapter":102,"slug":12},"Anhang.18","4.2.5. Strombelastbarkeit, DC-Systeme, Züge im Stillstand",{"norm_key":155,"title":156,"chapter":102,"slug":12},"Anhang.19","4.2.6. Nutzbremsung",{"norm_key":158,"title":159,"chapter":102,"slug":12},"Anhang.20","4.2.7. Koordination des elektrischen Schutzes",{"norm_key":161,"title":162,"chapter":102,"slug":12},"Anhang.21","4.2.8. Oberschwingungen und dynamische Effekte in AC-Systemen",{"norm_key":164,"title":165,"chapter":102,"slug":12},"Anhang.22","4.2.9. Geometrie der Oberleitung",{"norm_key":167,"title":168,"chapter":102,"slug":12},"Anhang.23","4.2.9.1. Fahrdrahthöhe",{"norm_key":170,"title":171,"chapter":102,"slug":12},"Anhang.24","4.2.9.2. Maximale horizontale Auslenkung",{"norm_key":173,"title":174,"chapter":102,"slug":12},"Anhang.25","4.2.10. Stromabnehmerbegrenzungslinie",{"norm_key":176,"title":177,"chapter":102,"slug":12},"Anhang.26","4.2.11. Mittlere Kontaktkraft",{"norm_key":179,"title":180,"chapter":102,"slug":12},"Anhang.27","4.2.12. Dynamisches Verhalten und Stromabnahmequalität",{"norm_key":182,"title":183,"chapter":102,"slug":12},"Anhang.28","4.2.13. Stromabnehmerabstand für die Auslegung der Oberleitung",{"norm_key":185,"title":186,"chapter":102,"slug":12},"Anhang.30","4.2.14. Fahrdrahtwerkstoff",{"norm_key":188,"title":189,"chapter":102,"slug":12},"Anhang.31","4.2.15.1. Allgemeines",{"norm_key":191,"title":192,"chapter":102,"slug":12},"Anhang.32","4.2.15.2. Strecken mit zulässiger Höchstgeschwindigkeit v ≥ 250 km\u002Fh",{"norm_key":194,"title":195,"chapter":102,"slug":12},"Anhang.33","4.2.15.3. Strecken mit zulässiger Höchstgeschwindigkeit v \u003C 250 km\u002Fh",{"norm_key":197,"title":198,"chapter":102,"slug":12},"Anhang.34","4.2.16.1. Allgemeines",{"norm_key":200,"title":201,"chapter":102,"slug":12},"Anhang.35","4.2.16.2. Gehobene Stromabnehmer",{"norm_key":203,"title":204,"chapter":102,"slug":12},"Anhang.36","4.2.16.3. Gesenkte Stromabnehmer",{"norm_key":206,"title":207,"chapter":102,"slug":12},"Anhang.37","4.2.17. Streckenseitiges Energiedatenerfassungssystem",{"norm_key":209,"title":210,"chapter":102,"slug":12},"Anhang.38","4.2.18. Schutz vor elektrischem Schlag",{"norm_key":212,"title":213,"chapter":102,"slug":12},"Anhang.39","4.3.1. Allgemeine Anforderungen",{"norm_key":215,"title":216,"chapter":102,"slug":12},"Anhang.40","4.3.2. Schnittstelle zum Teilsystem „Fahrzeuge“",{"norm_key":218,"title":219,"chapter":102,"slug":12},"Anhang.41","4.3.3. Schnittstelle zum Teilsystem „Infrastruktur“",{"norm_key":221,"title":222,"chapter":102,"slug":12},"Anhang.42","4.3.4. Schnittstelle zum Teilsystem „Zugsteuerung\u002FZugsicherung und Signalgebung“",{"norm_key":224,"title":225,"chapter":102,"slug":12},"Anhang.43","4.3.5. Schnittstelle zum Teilsystem „Verkehrsbetrieb und Verkehrssteuerung“",{"norm_key":227,"title":228,"chapter":102,"slug":12},"Anhang.44","4.4. Betriebsvorschriften",{"norm_key":230,"title":231,"chapter":102,"slug":12},"Anhang.45","4.5. Instandhaltungsvorschriften",{"norm_key":233,"title":234,"chapter":102,"slug":12},"Anhang.46","4.6. Berufliche Qualifikationen",{"norm_key":236,"title":237,"chapter":102,"slug":12},"Anhang.47","4.7. Arbeitsschutz",{"norm_key":239,"title":240,"chapter":102,"slug":12},"Anhang.48","5.1. Liste der Komponenten",{"norm_key":242,"title":243,"chapter":102,"slug":12},"Anhang.49","5.2.1.1. Geometrie der Oberleitung",{"norm_key":245,"title":246,"chapter":102,"slug":12},"Anhang.50","5.2.1.2. Mittlere Kontaktkraft",{"norm_key":248,"title":249,"chapter":102,"slug":12},"Anhang.51","5.2.1.3. Dynamisches Verhalten",{"norm_key":251,"title":252,"chapter":102,"slug":12},"Anhang.52","5.2.1.4. Raum für Anhub des Seitenhalters",{"norm_key":254,"title":255,"chapter":102,"slug":12},"Anhang.53","5.2.1.5. Stromabnehmerabstand für die Auslegung der Oberleitung",{"norm_key":257,"title":258,"chapter":102,"slug":12},"Anhang.54","5.2.1.6. Stromaufnahme im Stillstand",{"norm_key":260,"title":261,"chapter":102,"slug":12},"Anhang.55","5.2.1.7. Fahrdrahtwerkstoff",{"norm_key":263,"title":264,"chapter":102,"slug":12},"Anhang.56","6. BEWERTUNG DER KONFORMITÄT DER INTEROPERABILITÄTSKOMPONENTEN UND EG-PRÜFUNG DER TEILSYSTEME",{"norm_key":266,"title":267,"chapter":102,"slug":12},"Anhang.57","6.1.1. Konformitätsbewertungsverfahren",{"norm_key":269,"title":270,"chapter":102,"slug":12},"Anhang.58","6.1.2. Anwendung der Module",{"norm_key":272,"title":273,"chapter":102,"slug":12},"Anhang.59","6.1.3. Innovative Lösungen für Interoperabilitätskomponenten",{"norm_key":275,"title":276,"chapter":102,"slug":12},"Anhang.60","6.1.4.1. Bewertung des dynamischen Verhaltens und der Stromabnahmequalität",{"norm_key":278,"title":279,"chapter":102,"slug":12},"Anhang.61","6.1.4.2. Bewertung der Stromaufnahme im Stillstand",{"norm_key":281,"title":282,"chapter":102,"slug":12},"Anhang.62","6.1.5. EG-Konformitätserklärung für die Interoperabilitätskomponente „Oberleitung“",{"norm_key":284,"title":285,"chapter":102,"slug":12},"Anhang.63","6.2.1. Allgemeine Bestimmungen",{"norm_key":287,"title":288,"chapter":102,"slug":12},"Anhang.64","6.2.2. Anwendung der Module",{"norm_key":290,"title":291,"chapter":102,"slug":12},"Anhang.65","6.2.2.1. Anwendung des Moduls SG",{"norm_key":293,"title":294,"chapter":102,"slug":12},"Anhang.66","6.2.2.2. Anwendung des Moduls SH1",{"norm_key":296,"title":297,"chapter":102,"slug":12},"Anhang.67","6.2.3. Innovative Lösungen",{"norm_key":299,"title":300,"chapter":102,"slug":12},"Anhang.68","6.2.4.1. Bewertung der mittleren nutzbaren Spannung",{"norm_key":302,"title":303,"chapter":102,"slug":12},"Anhang.69","6.2.4.2. Bewertung der Nutzbremsung",{"norm_key":305,"title":306,"chapter":102,"slug":12},"Anhang.70","6.2.4.3. Bewertung der Koordination des elektrischen Schutzes",{"norm_key":308,"title":309,"chapter":102,"slug":12},"Anhang.71","6.2.4.4. Bewertung von Oberschwingungen und dynamischen Effekten in AC-Systemen",{"norm_key":311,"title":312,"chapter":102,"slug":12},"Anhang.72","6.2.4.5. Bewertung des dynamischen Verhaltens und der Stromabnahmequalität (Integration in ein Teilsystem)",{"norm_key":314,"title":315,"chapter":102,"slug":12},"Anhang.73","6.2.4.6. Bewertung der Schutzvorkehrungen gegen elektrischen Schlag",{"norm_key":317,"title":318,"chapter":102,"slug":12},"Anhang.74","6.2.4.7. Bewertung des Instandhaltungsplans",{"norm_key":320,"title":321,"chapter":102,"slug":12},"Anhang.75","6.3.1. Voraussetzungen",{"norm_key":323,"title":324,"chapter":102,"slug":12},"Anhang.76","6.3.2. Dokumentation",{"norm_key":326,"title":327,"chapter":102,"slug":12},"Anhang.77","6.3.3. Instandhaltung der gemäß Abschnitt 6.3.1 geprüften Teilsysteme",{"norm_key":329,"title":330,"chapter":102,"slug":12},"Anhang.78","7. UMSETZUNG DER TSI „ENERGIE“",{"norm_key":332,"title":333,"chapter":102,"slug":12},"Anhang.79","7.1. Anwendung dieser TSI auf Eisenbahnstrecken",{"norm_key":335,"title":336,"chapter":102,"slug":12},"Anhang.80","7.2.1. Einleitung",{"norm_key":338,"title":339,"chapter":102,"slug":12},"Anhang.81","7.2.2. Umsetzungsplan für Spannung und Frequenz",{"norm_key":341,"title":342,"chapter":102,"slug":12},"Anhang.82","7.2.3.1. Gegenstand des Umsetzungsplans",{"norm_key":344,"title":345,"chapter":102,"slug":12},"Anhang.83","7.2.3.2. Umsetzungsvorschriften für Bahnsysteme mit 1 435-mm-Spurweite",{"norm_key":347,"title":348,"chapter":102,"slug":12},"Anhang.84","7.2.3.3. Bahnsysteme mit anderer Spurweite als 1 435 mm",{"norm_key":350,"title":351,"chapter":102,"slug":12},"Anhang.85","7.2.4. Errichtung des streckenseitigen Energiedatenerfassungssystems",{"norm_key":353,"title":354,"chapter":102,"slug":12},"Anhang.86","7.3.1. Einleitung",{"norm_key":356,"title":357,"chapter":102,"slug":12},"Anhang.87","7.3.2. Umrüstung\u002FErneuerung der Oberleitung und\u002Foder der Energieversorgung",{"norm_key":359,"title":360,"chapter":102,"slug":12},"Anhang.88","7.3.3. Instandhaltungsparameter",{"norm_key":362,"title":363,"chapter":102,"slug":12},"Anhang.89","7.3.4. Bestehende Teilsysteme, die nicht Gegenstand eines Umrüstungs- oder Erneuerungsprojekts sind",{"norm_key":365,"title":366,"chapter":102,"slug":12},"Anhang.90","7.4.1. Allgemeines",{"norm_key":368,"title":369,"chapter":102,"slug":12},"Anhang.91","P-Fall",{"norm_key":371,"title":372,"chapter":102,"slug":12},"Anhang.92","T-Fall",{"norm_key":374,"title":369,"chapter":102,"slug":12},"Anhang.93",{"norm_key":376,"title":369,"chapter":102,"slug":12},"Anhang.94",{"norm_key":378,"title":369,"chapter":102,"slug":12},"Anhang.95",{"norm_key":380,"title":369,"chapter":102,"slug":12},"Anhang.96",{"norm_key":382,"title":369,"chapter":102,"slug":12},"Anhang.97",{"norm_key":384,"title":369,"chapter":102,"slug":12},"Anhang.98",{"norm_key":386,"title":369,"chapter":102,"slug":12},"Anhang.99",{"norm_key":388,"title":369,"chapter":102,"slug":12},"Anhang.100",{"norm_key":390,"title":369,"chapter":102,"slug":12},"Anhang.101",{"norm_key":392,"title":369,"chapter":102,"slug":12},"Anhang.102",{"norm_key":394,"title":369,"chapter":102,"slug":12},"Anhang.103",{"norm_key":396,"title":369,"chapter":102,"slug":12},"Anhang.104",{"norm_key":398,"title":369,"chapter":102,"slug":12},"Anhang.105",{"norm_key":400,"title":369,"chapter":102,"slug":12},"Anhang.106",{"norm_key":402,"title":372,"chapter":102,"slug":12},"Anhang.107",{"norm_key":404,"title":405,"chapter":102,"slug":12},"Anhang A.1","A.1 ANWENDUNGSBEREICH",{"norm_key":407,"title":408,"chapter":102,"slug":12},"Anhang A.2","A.2 MERKMALE",{"norm_key":410,"title":411,"chapter":102,"slug":12},"Anhang A.3","Bewertung der Interoperabilitätskomponente „Oberleitung“",{"norm_key":413,"title":414,"chapter":102,"slug":12},"Anhang B.1","B.1 ANWENDUNGSBEREICH",{"norm_key":416,"title":417,"chapter":102,"slug":12},"Anhang B.2","B.2 MERKMALE",{"norm_key":419,"title":420,"chapter":102,"slug":12},"Anhang B.3","EG-Prüfung des Teilsystems „Energie“",{"norm_key":422,"title":423,"chapter":102,"slug":12},"Anhang C.1","C.1 WERTE DER MITTLEREN NUTZBAREN SPANNUNG AM STROMABNEHMER",{"norm_key":425,"title":426,"chapter":102,"slug":12},"Anhang C.2","Minimale mittlere nutzbare Spannung am Stromabnehmer",{"norm_key":428,"title":429,"chapter":102,"slug":12},"Anhang C.3","C.2 SIMULATIONSREGELN",{"norm_key":431,"title":432,"chapter":102,"slug":12},"Anhang D.1","D.1.1.1 Frei zu haltender Raum für elektrifizierte Strecken",{"norm_key":434,"title":435,"chapter":102,"slug":12},"Anhang D.2","D.1.1.2 Besonderheiten",{"norm_key":437,"title":438,"chapter":102,"slug":12},"Anhang D.3","D.1.1.3 Symbole und Abkürzungen",{"norm_key":440,"title":441,"chapter":102,"slug":12},"Anhang D.4","Legende:",{"norm_key":443,"title":444,"chapter":102,"slug":12},"Anhang D.5","D.1.2.1.1 Anwendungsbereich",{"norm_key":446,"title":447,"chapter":102,"slug":12},"Anhang D.6","D.1.2.1.2 Berechnungsmethode",{"norm_key":449,"title":450,"chapter":102,"slug":12},"Anhang D.7","D.1.2.1.3 Halbe Länge bw der Stromabnehmerwippe",{"norm_key":452,"title":453,"chapter":102,"slug":12},"Anhang D.8","D.1.2.1.4 Wankbewegung des Stromabnehmers ep",{"norm_key":455,"title":456,"chapter":102,"slug":12},"Anhang D.9","D.1.2.1.5 Zusätzliche Ausladung",{"norm_key":458,"title":459,"chapter":102,"slug":12},"Anhang D.10","D.1.2.1.6 Quasistatischer Effekt",{"norm_key":461,"title":462,"chapter":102,"slug":12},"Anhang D.11","D.1.2.1.7 Zuschläge",{"norm_key":464,"title":465,"chapter":102,"slug":12},"Anhang D.12","D.1.2.2 Spezifikation der Höhe der mechanischen Begrenzungslinie",{"norm_key":467,"title":468,"chapter":102,"slug":12},"Anhang D.13","D.1.3 Bezugsparameter",{"norm_key":470,"title":471,"chapter":102,"slug":12},"Anhang D.14","D.1.4 Berechnung der maximalen horizontalen Auslenkung des Fahrdrahts",{"norm_key":473,"title":474,"chapter":102,"slug":12},"Anhang D.15","D.2 SPEZIFIKATION DER STATISCHEN STROMABNEHMERBEGRENZUNGSLINIE (1 520-mm-BAHNSYSTEME)",{"norm_key":476,"title":477,"chapter":102,"slug":12},"Anhang D.16","Abstände zwischen unter Spannung stehenden Teilen der Oberleitung\u002Fdes Stromabnehmers und geerdeten Teilen von Fahrzeugen und ortsfesten Anlagen für Bahnsysteme mit 1 520 -mm-Spurweite",{"norm_key":479,"title":480,"chapter":102,"slug":481},"Anhang E","Normverweise","anhang-e",{"norm_key":483,"title":484,"chapter":102,"slug":485},"Anhang F","Liste offener Punkte","anhang-f",{"norm_key":487,"title":488,"chapter":102,"slug":489},"Anhang G","Glossar","anhang-g"]